<progress id="1prtb"><noframes id="1prtb">
<strike id="1prtb"><video id="1prtb"><strike id="1prtb"></strike></video></strike>
<th id="1prtb"></th>
<th id="1prtb"></th>
<th id="1prtb"></th>
<th id="1prtb"><noframes id="1prtb"><span id="1prtb"></span>
<th id="1prtb"><noframes id="1prtb">
<span id="1prtb"></span>
<span id="1prtb"></span><th id="1prtb"></th>
<span id="1prtb"><noframes id="1prtb"><span id="1prtb"></span>
<th id="1prtb"><noframes id="1prtb"><span id="1prtb"></span>
<span id="1prtb"><noframes id="1prtb">
<ruby id="1prtb"><video id="1prtb"><ruby id="1prtb"></ruby></video></ruby>
<th id="1prtb"></th>
<span id="1prtb"></span>
 
News
  Company news
  Industrial news
  Technical Articles
ADD:7th floor,Building 6,Zhongyuntai Industrial Park,Tangtou Road,Shiyan Street,Baoan District,Shenzhen,China.
TEL:+86 0755-83413846 83428873
FAX:+86 0755-83427458
EMAIL:szeload@126.com
 
Technical Articles Home  -  News  -  Technical Articles
The distributed power station application process
Distributed mainly approval documents:
1. The land use right (forms: transfer or lease)
2. Power grid licensing company
3. The development and reform commission for examination and approval for the record
Step 1: determine the land use right
1. Find the target land, determine the land owner or the jurisdiction of the administrative units.
2. The bureau of land and resources that nature of the land, barren hill slope, agricultural land (need to build greenhouses photovoltaic power station or complementary production), fish ponds and lakes (built yu light complementary distributed power plant)
3. Introspection, cities, villages and towns as investment projects, the specific land transfer as the land. For example (a
Leave to farmers rent; B. public resources to the corresponding administrative unit rent; C. has been third-party leased land rent to a third party) note: factory do 1 mw of basic roof is 1 square, do 1 mw power station need to 25 to 30 acres of ground
The second step: licensing the interconnection
1. The plan passed by the national development and reform commission, the electric power company issued according to the project design access scheme draft (the national electric power company issued by free). Got the license for the grid
Step 3: the national development and reform commission for the record project (currently distributed power plant installations provinces are gap is very big, so have to promote the strength of the larger)
1. To land, development and reform commission (NDRC) new energy functions with distributed power plant the application form, the corresponding complete;
2. According to land condition, combining the local development and reform commission (NDRC), issue the plan feasibility study report (preliminary), note: there are a lot of unit can write the work
Previous:Photovoltaic pumping and lighting applications
Under:The principle and application of the photovoltaic inverter in the system
 
Home  |  About us   |    Products   |    News   |    Projects   |    Join us   |    Contact us
Hot keywords:Wind Controller    Inverter    AC and DC power distribution cabinet    Emergency backup power
Copyright © 2015-2018 Shenzhen Eload Energy Co., Ltd. All Rights Reserved.
Add:7th floor,Building 6,Zhongyuntai Industrial Park,Tangtou Road,Shiyan Street,Baoan District,Shenzhen,China.
Links: Wind Controller    Inverter    AC and DC power distribution cabinet    Emergency backup power    
狠狠色丁香婷婷综合尤物